Warning: mkdir(): No space left on device in /www/wwwroot/new16.com/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/zjyzjc.com/cache/d8/9d546/c0652.html): failed to open stream: No such file or directory in /www/wwwroot/new16.com/func.php on line 115
HENGTONG GROUP CO.,LTD.


    1. 大香蕉在线播放,香蕉视频下载观看,香蕉视频下载IOS,香蕉视频APP一级黄片

      News

      News

      Home| News| News

      Hengtong has completed the submarine power cable emergency repair EPC project

      2022-9-30 8369 Font size:

      Hengtong has completed the submarine power cable emergency repair EPC project located on Bohol Island for a local power transmission company in the Philippines. This is Hengtong’s first submarine power cable emergency repair EPC project. Hengtong completed the mission 10 days ahead of schedule. The cable was successfully powered on.

      Hengtong will constantly provide stable power transmission for global customers.

      1664525568029.jpg

      网站地图